The forecast gate I almost got wrong

I guessed a rule for when Hecate's forecasts were trustworthy enough to show. The guess was wrong. Testing it against real data gave me a better one, and testing didn't stop once the feature shipped.

Before I added forecasting to Hecate, I had a rule of thumb in my head: a repository needs at least twice the forecast horizon in observed history before I'd trust a prediction for it. Twice the horizon, so a 7-day forecast wants 14 days of data. It sounded reasonable. I did not check it against anything.

So before building the feature around it, I spiked TimesFM, Google's zero-shot time-series model, against real npm download-count series and measured where it actually stopped being better than a naive baseline. The heuristic was wrong in the useful direction: at 8 days of context it already clears a 20%-better-than-naive bar, and by 14 days it clears it decisively, 58.7% improvement with 80.7% quantile calibration. The real gate is looser than my guess, which meant the guess would have been quietly hiding forecasts I could have shown. I only tested the 7-day horizon that way, so the 30-day gate still runs on the untested heuristic, and it's labelled as such rather than dressed up as evidence it isn't.

A few other decisions came out of the same instinct to check rather than assume. The model outputs quantiles, not a single point estimate, so a repository's own uncertainty shows up as band width instead of getting flattened into one confident number. Forecasts that don't clear the gate get written as NULL rather than omitted, matching a convention already used elsewhere in the project: NULL means "we chose not to guess," not "there is nothing here." And every forecast run writes through three separate verification layers, because a job that logs success and a job that actually did the right thing are not always the same job.

That last point turned out to matter almost immediately. Four real bugs surfaced while building this, all caught by running the code against real data rather than by tests passing: a backwards ORDER BY from a bad assertion, a missing package in the forecast image's requirements file, a numpy version pinned for the wrong Python, and one more after the feature had already merged. The daily job's container image tag didn't match what got built, so the scheduled run never actually happened. It logged nothing, because there was nothing running to log. The first real forecast only landed the following day, once the tag was fixed and I confirmed a full run end to end rather than trusting that a merged PR meant a working pipeline.

None of these were exotic bugs. They were the ordinary kind that "the tests pass" does not catch, because the tests were testing the code, not the deployed thing running it. Shipping the feature was the easy half. Watching it actually forecast something on a real schedule was the part that told me it worked.

  • forecasting
  • hecate
  • data-engineering